LHR – BA Line Marking
A project to re-paint all the lines and signs on the British Airways East and West maintenance bases, and replace the cat’s eyes on the base. Prior to the new lines being painted, the old [...]
Eastern Balancing Reservoir Bridge Pipework Replacements
RK Air replaced and installed 500Dn all flanged Ductile Iron pipework across the LHR Eastern Balancing Reservoir middle pond bridge. We used a barge to get the pipework into position, and deployed a floating pontoon [...]
LHR: Firemain Hydrants & Valves Replacement
These works at the British Airways Maintenance Base comprised the replacement of hydrants and valves, including all the associated civil engineering works. The initial phase saw RK Air replace 18nr firemain hydrants and 9nr isolation [...]
LHR Terminal 3: Northern Boiler Temporary Connection
A project to provide a northern boiler temporary connection to HTHW system within the services tunnel adjacent to Heathrow Terminal 3. The RK Air works included freezing the existing pipe network using liquid nitrogen, cutting [...]
LGW: Firemain Replacement
Phase One in ILS Critical Area
RK Air's works included the supply and installation of 1200m of new 250mm ductile iron firemain within the ILS critical area at Gatwick Airport. Works undertaken included all the associated civil engineering, including excavating the [...]