1212, 2017
  • Eastern Balancing Reservoir Steelwork Package
    Gallery

    Eastern Balancing Reservoir Steelwork Package

    Completed

Eastern Balancing Reservoir Steelwork Package

Another project at the Eastern Balancing Reservoir involving complex installation and welding of a number of steel fittings and grates within the camp 4 pumping station. Having been fabricated off-site, the steelwork had to be [...]

1710, 2017
  • LHR – Known Firemain Failures
    Gallery

    LHR – Known Firemain Failures

    Completed

LHR – Known Firemain Failures

This project is divided between several areas airside and landside. There are 12-15no separate zones where works are required to be carried out in a variety of complex environments. The project involves breaking into [...]

1710, 2017
  • LHR – Firemain Asset Replacements 2017
    Gallery

    LHR – Firemain Asset Replacements 2017

    Completed

LHR – Firemain Asset Replacements 2017

Works have continued at the British Airways Maintenance Base where we are to replace a further 4no hydrants and 15no valves across the base, including all associated civil works and full reinstatement of the [...]

2609, 2017
  • More Work at LHR Eastern Balancing Reservoir
    Gallery

    More Work at LHR Eastern Balancing Reservoir

    Completed

More Work at LHR Eastern Balancing Reservoir

Another project at the Eastern Balancing Reservoir. Here, RK Air is to install 4no manhole chambers and the connecting concrete pipework and push-fit ductile iron, in addition to a valve chamber that houses 2no 400mm [...]

1008, 2017
  • LHR Eastern Balancing Reservoir works
    LHR – Eastern Balancing Reservoir – Surge Vessel
    Gallery

    LHR – Eastern Balancing Reservoir – Surge Vessel

    Completed

LHR – Eastern Balancing Reservoir – Surge Vessel

This project includes the installation of pipework within a temporary bypass constructed from concrete culverts above ground, and then connecting it to existing pipework below ground. RK Air's task encompasses all associated civil works, the [...]

508, 2017
  • LHR – Area 4 Strip out and installation
    Gallery

    LHR – Area 4 Strip out and installation

    Completed

LHR – Area 4 Strip out and installation

RK Air’s works here are to install new LTHW heating mains to accommodate new connections to the future CHP header building, and also to upgrade existing pipework circuits. This is within a challenging confined spaces [...]

Previous234Next

Recent Posts

  • FORS Gold for RK Air
  • FORS guidance helps our drivers achieve best practice.
  • Heathrow Terminal 3 Service Subway – LTHW Pipework Upgrades
  • British Airways Fire Main Asset Replacements (August 2019)
  • Work on the MBBR Eastern Balancing Reservoir is Complete

Archives

  • July 2020
  • January 2020
  • September 2019
  • August 2019
  • April 2019
  • March 2019
  • November 2018
  • June 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • November 2015
  • October 2015
  • September 2015
Copyright 2022 RK Air | All Rights Reserved | Website by Swordfish Marketing
Registered Office: Robert Whowell & Partners, Westwood House, 78 Loughborough Road, Quorn, Leicestershire, LE12 8DX