EBR Surge Vessel
The next phase of the LHR Eastern Balancing Reservoir Surge Vessel works is underway. Having established a temporary Surge Vessel and the temporary bypass pipework, the de-commissioning of the old 10 metre long, 3 metre diameter Surge Vessel weighing 19 tonnes can be completed. This involves the removal of the wall to the pump house [...]