British Airways Fire Main Asset Replacements (August 2019)

With the assistance of our supply chain, RK Air has continued to deliver high standards of work in 2019 at the British Airways Maintenance Base, under our ongoing framework. So far, we have successfully delivered the removal of existing 400mm/225mm vales and associated 600mm/225mm pipework to allow the mechanical installations and all associated civils [...]

By |August 23rd, 2019|Completed|

Work on the MBBR Eastern Balancing Reservoir is Complete

Our work on the Eastern Balancing Reservoir at Heathrow is complete. The project included drainage, road formation and a concrete delivery bay for client Morgan Sindall. We think it showcases our broad range of skills, expertise and operational efficiency in Civils works perfectly. In a bit more detail, the project comprised: Additional manholes and concrete stormwater drainage [...]

By |April 12th, 2019|Completed|

MBBR Eastern Balancing Reservoir Works at Heathrow

RK Air’s works are continuing at the Eastern Balancing Reservoir (EBR) at Heathrow. The MBBR EBR project consists of the installation of 200dn and 300dn ductile iron pipework and all associated civils next the to the new waste water treatment plant at EBR. Our team also installed an additional manhole and penstock. In addition, we [...]

By |November 7th, 2018|Completed|

RK Air Helps Out with Community Project

At RK Air, we've been helping out with community support this month. Green Corridor is a local charity based near Heathrow that helps disadvantaged young people. Its aim is to train them to achieve a land-based qualification in horticulture or conservation. The charity's motto is 'Dig. Plant. Grow. Achieve.' So our team got stuck right in [...]

By |February 22nd, 2018|Completed|

Eastern Balancing Reservoir Steelwork Package

Another project at the Eastern Balancing Reservoir involving complex installation and welding of a number of steel fittings and grates within the camp 4 pumping station. Having been fabricated off-site, the steelwork had to be lifted in and installed in stages using a crane. You can see the scale of these grates from one of [...]

By |December 12th, 2017|Completed|