Yearly Archives: 2019

Home/2019

Heathrow Terminal 3 Service Subway – LTHW Pipework Upgrades

RK Air returned to the Terminal 3 Services Tunnels to complete upgrades to the LTHW pipework system. The purpose of this installation was to replace existing pipework that was identified as being in poor condition following NDT testing, with new 100mm,150mm, 200mm pipework complete with associated isolation, flushing, drain and venting valves and test [...]

By |September 10th, 2019|Recent|

British Airways Fire Main Asset Replacements (August 2019)

With the assistance of our supply chain, RK Air has continued to deliver high standards of work in 2019 at the British Airways Maintenance Base, under our ongoing framework. So far, we have successfully delivered the removal of existing 400mm/225mm vales and associated 600mm/225mm pipework to allow the mechanical installations and all associated civils [...]

By |August 23rd, 2019|Completed|

Work on the MBBR Eastern Balancing Reservoir is Complete

Our work on the Eastern Balancing Reservoir at Heathrow is complete. The project included drainage, road formation and a concrete delivery bay for client Morgan Sindall. We think it showcases our broad range of skills, expertise and operational efficiency in Civils works perfectly. In a bit more detail, the project comprised: Additional manholes and concrete stormwater drainage [...]

By |April 12th, 2019|Completed|